The single-stroke longwall mining method is mainly used for gently inclined, inclined thin and medium thick coal seams or gently inclined 3.5-5.0m thick coal seams
1. Tunneling
The first step is Shimen 1 in the mining area-the lower parking lot 3 in the mining area-uphill 4 in the mining area, 5-the upper parking area in the mining area 6-the return wind stone gate 2 in the mining area ( Through)
In the second step, the mining area goes uphill 4-----Central Depot 7---- Section Return Air Alley 8 Section Transport Alley 9 (Connecting Alley 11 is dug every 150m) Open cuts, upper stope 6--- - Sectional return air lane 10 - leave 10m coal pillars at the mining area boundary
Digging room
The third step is to install mechanical and electrical equipment for ventilation facilities, and transfer to production for 15 days after trial operation
Material transportation system Coal mining fabric mining area transportation Shimen 1---the lower depot 3 of the mining area—track uphill 4—the upper depot 6—section return air lane 10—work surface mouth
Tunneling fabrics, coal mining fabrics, mining area, Shimen 1---lower depot 3 of the mining area—track uphill 4—central depot 7'-----------8' section return air Lane 9'section transportation lane-----heading surface
Coal transportation system coal section transportation lane 9-transportation uphill 5-mining area coal bunker 12-mining area transportation Shimen 1-foreign transportation
Waste discharge system 8'section return air lane 9'section transportation lane-middle depot 7'-track uphill 4-mining area lower depot 3-mining area transportation Shimen 1-----Sinotrans
ventilation system
Power supply system: input from transport
Compressed air and safe water system: (pipeline is transported)
2. The type of roadway that constitutes the production system of the mining area
1. Mining roadway — directly serving the mining face horizontally (along the strike); 2. Uphill roadway — serving each section and longitudinally (along the slope); 3. Upper, middle and lower parking yards in the mining area — connecting the uphill and section roadways Vertical-horizontal connection; 4. Chamber: winch room, substation, coal bunker, etc. 5. Connecting lanes attached to the above-mentioned various lanes.
3. Analysis of coal mining system
Coal mining system—the time coordination and the spatial relationship between the excavation of the mining roadway and the mining work.
Gradient --- Try to arrange horizontal roadways as far as possible. Direction --- consistent with the direction of the coal seam
Machine lane---straight lane---level
4. Single lane layout and double lane layout of section lanes
Shuangxiang: The second one is placed in a mobile substation. Conducive to ventilation, drainage, and coal exploration
Disadvantages: The cable transfer is complicated, which affects the passage of the hydraulic support, and the gap cannot be opened. Maintenance is difficult and the tunneling cost is high.
Single lane: 1) The mobile substation is in the upper lane, and the wind flow is reversed, less than 10 degrees;
Disadvantages: Cannot open the gap.
2) The mobile substation is in the lower lane, the common way, the belt should generally be arranged on the lower side.
Suitable for low gas content, stable coal seam burial, and low water inflow
5. Arrangement of single working face and double working face
Double-drawn working face: the lower working face is shorter than the upper working face, coal is transported upward, and the motor power is limited
Ventilation mode: the first type: middle entry, up and down; or up and down, middle return; the second type, middle and bottom entry, top return; the deviation is less than 5m, usually from bottom to top.
Advantages: low cost, high recovery rate, concentrated production, less excavation and maintenance, and less equipment.
Applicable conditions: non-comprehensive mining, the inclination of the coal seam is less than 12 degrees, the roof is moderately stable, and the gas is not large. Conditions can also be relaxed.
6. Stoping sequence: Backward, Forward, Reciprocating, Rotary
7. Sectional roadway protection without coal pillars
There are two benefits of keeping roadways along the goaf and driving roadways along the goaf. It can avoid or weaken the influence of fixed support pressure, improve the roadway maintenance status, reduce coal loss, and reduce the amount of excavation. The economic effect is significant.
Keeping roadways along goafs (drift filling): maintain the original mining roadways along the edges of the goaf after coal mining at the working face
It is divided into forward-style reserved lanes along the goaf, retreat-style reserved lanes along the goaf, and reciprocating type reserved lanes along the gob.
Suitable for thin and medium-thick coal seams with gently sloping and inclined, thickness below 2m
Digging along the goaf
Features: along the edge of the stable goaf of the overlying strata or leaving only a very narrow coal pillar to drive the roadway.

Applicable conditions: medium-thick and thick coal seams with gentle inclining, sloping, and large thickness.
8. Stope ventilation method and mining roadway layout
1. Requirements for ventilation on the working surface:
Comply with safety regulations to prevent the accumulation of gas in the upper corner; prevent air leakage; simple ventilation system; sufficient section of air lane.
2. There are 5 types of ventilation modes: U, Z, Y, H, W.
Application of single long-wall coal mining method Applicable conditions: gently inclined, inclined thin, medium and thick coal seams (under 5.5m) where the roof is easy to fall.