Jan 15, 2021 Leave a message

Azur Minerals Is Restarting Its Andover Copper Nickel Project In Western Australia

Azur Minerals has resumed diamond drilling at the Andover Copper Nickel project in Western Australia.


Diamond drilling up to 30,000 m will be completed to define the mineral resources on the VC-07 wire.


Previous work on the VC-07 target included fixed loop electromagnetic measurements, diamond drilling and downhole electromagnetic measurements.


The diamond drilling uncovered extensive areas of nickel-copper sulfide mineralization, with nickel and copper grades up to 2.85%.


The VC-07 represents a continuum of bedrock encased sulfide mineralization that extends over 1,050 m with a dip Angle of more than 200 m.


Azure believes this highlights the goal of achieving substantial nickel-copper sulfide deposits.


The drilling will also test the VC-23 conductor, where historical drilling returned two meters of nickel with a 2.1% nickel content and 0.44% copper content.


The first two RIGS were drilled on-site and the third is expected to arrive in mid-January.


Managing Director Tony Rovira said: "With the confirmation of an important nickel-copper discovery in Anover, the Azure board is shifting the company's focus from exploring the VC-07 mineralized body to resource definition."


"While most of the planned drilling work will focus on the VC-07 conductor, the Andover mine is a target-rich environment for further nickel and copper sulfide discoveries," he said.


"Geophysical surveys have found many conductors indicating sulfide mineralization in bedrock, and the first expected target, VC-23, has started drilling," he added.


Send Inquiry

whatsapp

Phone

E-mail

Inquiry